{"componentChunkName":"component---node-modules-csam-gatsby-theme-guides-src-templates-documentation-js","path":"/docs/ug302/","webpackCompilationHash":"9887d4de5ab7489123d8","result":{"data":{"allFile":{"edges":[{"node":{"name":"ug302","childMarkdownRemark":{"html":"<p>Requisitions can be logged in the C-SAM system for tracking.</p>\n<h2>How to Raise a Requisition</h2>\n<ol>\n<li>Go to the <strong>Procurement</strong> category and select <strong>Requisition</strong>.</li>\n</ol>\n<p><img src=\"/img//procurement/ug302/ug302-001.png\" alt=\"Requisition Dataset\"></p>\n<ol start=\"2\">\n<li>Select <strong>New Record>Requisitions</strong> or hit <strong>Insert</strong> on your keyboard to create a new record.</li>\n<li>Complete the relevant fields on the Requisition (hdr).</li>\n</ol>\n<blockquote>\n<p><strong>Note:</strong> (Pink = System Generated, Blue = Mandatory):</p>\n</blockquote>\n<p><img src=\"/img//procurement/ug302/ug302-002.png\" alt=\"Requisition\"></p>\n<table>\n<thead>\n<tr>\n<th>Field</th>\n<th>Description</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Enquiry Number</td>\n<td>Defaulted if created within the Enquiry record, enter or use binocluars to search for relevant number if required.</td>\n</tr>\n<tr>\n<td>For Job Number</td>\n<td>Enter or use the binoculars to assign the relevant Job Number</td>\n</tr>\n<tr>\n<td>Raised by User</td>\n<td>Defaulted to the user logged in. Can be changed</td>\n</tr>\n<tr>\n<td>Requested by User</td>\n<td>Select the relevant user</td>\n</tr>\n<tr>\n<td>Date of Req</td>\n<td>Defaulted to today’s date, can be changed</td>\n</tr>\n<tr>\n<td>Required by Date</td>\n<td>Enter/Select the relevant date the goods are required by</td>\n</tr>\n<tr>\n<td>Work Site</td>\n<td>Defaults from the Job Number if specified</td>\n</tr>\n<tr>\n<td>Buyer User</td>\n<td>Select the relevant user</td>\n</tr>\n<tr>\n<td>Free Issue Requisition</td>\n<td>If goods are issued by a supplier with no cost verified at the time of the order, enabling this tickbox will not demand a value to be entered by the system</td>\n</tr>\n<tr>\n<td>Confidential</td>\n<td>Enabling this checkbox means that only the ‘Added User’, ‘Requested by User’ ‘Buyer User’ and ‘Approved by User’ will see the requisition</td>\n</tr>\n<tr>\n<td>For Asset Number</td>\n<td>Users can link a requisition to a specific Asset Number if required, enter or use the binoculars to search for the number</td>\n</tr>\n<tr>\n<td>For Department</td>\n<td>Select the relevant department from the drop down menu</td>\n</tr>\n<tr>\n<td>For Campaign</td>\n<td>Enter the relevant Campaign number if required</td>\n</tr>\n<tr>\n<td>Office</td>\n<td>Select the relevant Office</td>\n</tr>\n<tr>\n<td>Stock Location</td>\n<td>Select the relevant Stock Location</td>\n</tr>\n<tr>\n<td>Delivery Address</td>\n<td>Use the binoculars to search for the relevant delivery address. This will also update the ‘Deliver to’ field</td>\n</tr>\n<tr>\n<td>Deliver To</td>\n<td>Text Field to enter the delivery address</td>\n</tr>\n<tr>\n<td>Justification</td>\n<td>Text field to explain justification for purchase</td>\n</tr>\n<tr>\n<td>Special Instructions</td>\n<td>Text field for additional instructions</td>\n</tr>\n<tr>\n<td>SAR No</td>\n<td>Service Action Request (SAR), the user can link the requisition to an SAR within the NCR dataset if required</td>\n</tr>\n<tr>\n<td>Technical Review by User</td>\n<td>Select the relevant user if the goods require technical review</td>\n</tr>\n<tr>\n<td>To be Reviewed by User</td>\n<td>Select the relevant user if the goods require review</td>\n</tr>\n<tr>\n<td>To be Approved by User</td>\n<td>Select the relevant user who will approve the requisition</td>\n</tr>\n<tr>\n<td>Capex Approval No</td>\n<td>Select the relevant Capex Approval No if required</td>\n</tr>\n<tr>\n<td>Linked Document</td>\n<td>The user can link a file/folder or webpage to the Requisition if required</td>\n</tr>\n<tr>\n<td>Cost Centre</td>\n<td>Select the relevant Cost Centre from the drop down menu if required</td>\n</tr>\n</tbody>\n</table>\n<p>Select Save and you will now see that the Req Number field has generated a unique ID.</p>\n<blockquote>\n<p><strong>Note:</strong> Closing or moving to another tab will save the record automatically unless the blue mandatory fields have been missed.</p>\n</blockquote>\n<ol start=\"4\">\n<li>To add Items to your requisition, you can either select <strong>New Record>Requisition Items</strong> or select the <strong>Requisition Items</strong> tab and hit <strong>Insert</strong> on your keyboard.</li>\n</ol>\n<p>Complete the relevant fields on the Requisition Items (hdr).</p>\n<blockquote>\n<p><strong>Note:</strong> (Pink = System Generated, Blue = Mandatory):</p>\n</blockquote>\n<p><img src=\"/img//procurement/ug302/ug302-003.png\" alt=\"Requisition Item\"></p>\n<table>\n<thead>\n<tr>\n<th>Field</th>\n<th>Description</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Requested Qty</td>\n<td>Enter a value of the qty required</td>\n</tr>\n<tr>\n<td>Our Part No</td>\n<td>Enter or use the binoculars to search for relevant Part No if ordering Stock, Leave this field blank if ordering Assets</td>\n</tr>\n<tr>\n<td>Non Listed Description</td>\n<td>Manually enter the description of the goods required, these would be classed as Non Stock Items, leave this field blank if ordering Assets</td>\n</tr>\n<tr>\n<td>Hire</td>\n<td>Enabling this tickbox means that you will be hiring the goods from the Supplier</td>\n</tr>\n<tr>\n<td><strong>Requisition (Hdr)</strong></td>\n<td></td>\n</tr>\n<tr>\n<td>RFQ Required</td>\n<td>Request for Quote (RFQ), enabling this checkbox means that you require quotes from multiple suppliers to receive best rates, delivery times etc.</td>\n</tr>\n<tr>\n<td>UOM</td>\n<td>Unit of Measure (UOM), select the relevant UOM from the drop down if required</td>\n</tr>\n<tr>\n<td>Phase</td>\n<td>Select the relevant phase from the drop down if required</td>\n</tr>\n<tr>\n<td>Custom Status</td>\n<td>Select the relevant Custom Status if required</td>\n</tr>\n<tr>\n<td>Procedure Number</td>\n<td>Select the relevant procedure number if required</td>\n</tr>\n<tr>\n<td>Quayside Item</td>\n<td>Enabling this tickbox means that the goods will need to be delivered directly to the quayside or client site</td>\n</tr>\n<tr>\n<td>Required by Date</td>\n<td>Enter/Select the relevant date the goods are needed by</td>\n</tr>\n<tr>\n<td>Item Comment</td>\n<td>Text field to note additional information</td>\n</tr>\n<tr>\n<td>Zone Requirement</td>\n<td>Select the relevant zone if required</td>\n</tr>\n<tr>\n<td>Type of Request</td>\n<td>Select the relevant type from the drop down if required</td>\n</tr>\n<tr>\n<td>Purchase Type</td>\n<td>Select the relevant type from the drop down if required</td>\n</tr>\n<tr>\n<td>Priority</td>\n<td>Select the relevant priority level for the item</td>\n</tr>\n<tr>\n<td>Category of Risk</td>\n<td>Select the relevant category if a risk assessment is required</td>\n</tr>\n<tr>\n<td>Special Instructions</td>\n<td>Text field to add additional information</td>\n</tr>\n<tr>\n<td>Category</td>\n<td>If the requisition if for buying assets, select the relevant category</td>\n</tr>\n<tr>\n<td>Equipment Type</td>\n<td>If the requisition if for buying assets, select the relevant equipment type</td>\n</tr>\n<tr>\n<td>Asset Description</td>\n<td>If the requisition if for buying assets, select the relevant description</td>\n</tr>\n<tr>\n<td>Client Approved</td>\n<td>Enabling this tickbox means that the client will need to approve the Requisition item</td>\n</tr>\n<tr>\n<td>Not a Balance Type</td>\n<td>This is set by the system and is based on the type of stock</td>\n</tr>\n<tr>\n<td>Dangerous Goods</td>\n<td>This is set by the system and is based on the type of stock</td>\n</tr>\n<tr>\n<td>Certification Required</td>\n<td>Enabling this tickbox indicates you require a certificate from the supplier for the item</td>\n</tr>\n<tr>\n<td>QA Inspection Required</td>\n<td>Enabling this tickbox indicates that you need QA to inspect the goods</td>\n</tr>\n<tr>\n<td>Stores Inspection</td>\n<td>Enabling this tickbox indicates that you need stores to inspect the goods</td>\n</tr>\n<tr>\n<td>Requisitioner Inspection Req</td>\n<td>Enabling this tickbox indicates that you need the requisitioner to inspect the goods</td>\n</tr>\n<tr>\n<td>Third Party Inspection Req</td>\n<td>Enabling this tickbox indicates that you need a 3rd party to inspect the goods</td>\n</tr>\n<tr>\n<td>Method Statement</td>\n<td>Enabling this tickbox indicates that a method statement is required</td>\n</tr>\n<tr>\n<td>Risk Assessment</td>\n<td>Enabling this tickbox indicates that a risk assessment is required</td>\n</tr>\n</tbody>\n</table>\n<p>Select Save from the toolbar.</p>\n<ol start=\"5\">\n<li>Within the <strong>Supplier Information</strong> tab, you will need to fill in the Pref Supplier and/or Quote 2 Supplier (if RFQ required) and/or Quote 3 Supplier (if RFQ Required).</li>\n</ol>\n<p><img src=\"/img//procurement/ug302/ug302-004.png\" alt=\"Supplier Information\"></p>\n<p>Now go into the <strong>Finance Breakdown</strong> tab and select the relevant Cost Finance Code and Cost Centre from the drop down menus:</p>\n<p><img src=\"/img//procurement/ug302/ug302-005.png\" alt=\"Finance Breakdown\"></p>\n<p>If you have more than 1 requisition item, you can select the Next button.</p>\n<p>Once you have added the requisition items required, close the tab, select Refresh you will see the items populate in this screen view.</p>\n<p><img src=\"/img//procurement/ug302/ug302-006.png\" alt=\"Requisition Items\"></p>\n<ol start=\"6\">\n<li>If you have supplier and price details you can update the Supplier Information, within the <strong>Requisition Items</strong> tab select Open All, now go to the <strong>Supplier Information</strong> tab and fill in the fields required.</li>\n</ol>\n<blockquote>\n<p><strong>Note:</strong> (Pink = System Generated, Blue = Mandatory):</p>\n</blockquote>\n<p><img src=\"/img//procurement/ug302/ug302-007.png\" alt=\"Supplier Information\"></p>\n<table>\n<thead>\n<tr>\n<th>Field</th>\n<th>Description</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Frame Agreement No</td>\n<td>If required, you can assign a Frame Agreement No either by manually typing in the number or using the binoculars to search for the relevant one.</td>\n</tr>\n<tr>\n<td>Frame Agreement Rate</td>\n<td>If required, you can assign a Frame Agreement Rate either by manually typing in the number or using the binoculars to search for the relevant one.</td>\n</tr>\n<tr>\n<td>Pref Supplier</td>\n<td>Using the drop down, select the supplier name you wish to purchase the goods/services from.</td>\n</tr>\n<tr>\n<td>Quote 2 Supplier</td>\n<td>Only required if using RFQ option.</td>\n</tr>\n<tr>\n<td>Quote 3 Supplier</td>\n<td>Only required if using RFQ option.</td>\n</tr>\n<tr>\n<td>Confirmed Supplier</td>\n<td>From the drop down, select the supplier name you wish to purchase the goods/services from</td>\n</tr>\n<tr>\n<td>Confirmed Address</td>\n<td>From the drop down select the address of the supplier selected.</td>\n</tr>\n<tr>\n<td>Purchase Currency</td>\n<td>From the drop down select the currency you will use to pay the Supplier selected.</td>\n</tr>\n<tr>\n<td>Order Qty</td>\n<td>This will automatically update from the Requisition Item (Hdr) Tab, however can be amended in this field.</td>\n</tr>\n<tr>\n<td>Confirmed Cost PC</td>\n<td>PC = Purchase Cost, enter the unit cost of the item you are purchasing from the supplier.</td>\n</tr>\n<tr>\n<td>Tax Code</td>\n<td>If required, select a tax code from the drop down menu.</td>\n</tr>\n<tr>\n<td>Supplier Part No</td>\n<td>Manually enter the part number used by the Supplier.</td>\n</tr>\n<tr>\n<td>Supplier Description</td>\n<td>This is an open text field and can be used to record the supplier description if different from the Item Description set up in the system.</td>\n</tr>\n<tr>\n<td>Shipped Directly to Site</td>\n<td>If this tick box is checked the delivery address will now be the ‘Worksite’ rather than the ‘Deliver To’ address.</td>\n</tr>\n<tr>\n<td>Expected Delivery</td>\n<td>From the diary, select the expected delivery date.</td>\n</tr>\n<tr>\n<td>Lead Time Days</td>\n<td>Manually enter the amount of days until you will be in receipt of the goods/services.</td>\n</tr>\n<tr>\n<td>Discrepancy Reason</td>\n<td>This field allows you to enter a reason for the discrepancy from the Qty Required and Order Qty, i.e. supplier availability.</td>\n</tr>\n</tbody>\n</table>\n<ol start=\"7\">\n<li>If you require a Buyer to action a Requisition, you will need to pick a Buyer User on the <strong>Requisition (Hdr)</strong>:</li>\n</ol>\n<p><img src=\"/img//procurement/ug302/ug302-008.png\" alt=\"Requisition (Hdr)\"></p>\n<ol start=\"8\">\n<li>Select <strong>Functions>Request Action</strong>.</li>\n</ol>\n<p>Select OK.</p>\n<ol start=\"9\">\n<li>Once the Buyer has completed the Action Review, select <strong>Functions>Request Review</strong>, this should only be used if the Supplier and Price information has been entered.</li>\n</ol>\n<p>The To be Reviewed by User will now receive and email and notification that they are responsible for reviewing the requisition record.</p>","frontmatter":{"title":"How to Raise a Requisition & Submit for Review/Action","tags":["procurement","raise","requisition","review","action","supplier","finance","breakdown","requisition","item","items"]}}}}]}},"pageContext":{"isCreatedByStatefulCreatePages":false,"slug":"ug302"}}}